Specifications
1. Material: 18CrNiMo7-6, SAE 4340, 4140, S355JR, 8660 34Cr2Ni2MoA/34CrNI3MoA 2..Certificates:ISO9001-2008,SGS,PED
Forged Shaft, Shaft Forging, Forging Shaft
Detailed Description:1) Product Name: Forged Shaft, Shaft Forging2) Material: 4130, 4140, 4317, 4142, 4340, UNS440, 34CrNi3Mo, 25Cr2Ni4MoV, 18CrNiMo5, 30CrMo, 9Cr2Mo, 9Cr2W, 9Cr3Mo, 60CrMoV etc.3) Max weight: 60ton.4) MOQ: 20ton.5) FOB Port: Shanghai Port, China.6) Delivery Time: 60ton in 30 days.7) Delivery Condition: Rough Machined, Heat Treated, Fine Machined + EN10204: 3.1B8) Payment: 30% T/T in advance, Balanced C.A.D.; or 100% L/C.
***
Mill Frequently Used Steel Materials:1) Wind Power Shaft: 42CrMo4V, 34CrNiMo6; Wind Power Flange: S355NL, C22, 16Mn, 20Mn, 42CrMo, F304.2) Forged Pipe Fittings: SA106 CL B, SA106 CL C, WB36, 12Cr1MoV, SA335 P11, P12, P22, P91, SA182 Gr.F1, Gr.F5, Gr.F11 CL2, Gr.F12 CL2, Gr.F22 CL3, SA350 Gr.LF1, Gr.LF2, Gr.LF3. 3) Pressure Vessel Forgings: SA105, SA350 LF2, 16Mn, 20MnMo, 15MnMo, 12Cr2Mo1, 14Cr1Mo, F304, F316, 17-4PH.4) Shaft Related Forgings: 25CrMo4, 42CrMo4, 40CrNiMo, 34CrNi3Mo, 25Cr2Ni4MoV, 18CrNiMo5, 30CrMo, 4130, 4140.5) Gear Related Forgings: 35CrMo, 34CrMo4, 4137, 42CrMo, 4140, SCM440, 20CrMnMo, 40CrNiMo, 20CrNi2Mo, 20Cr2Ni4A, 34CrNi3Mo. 6) Copper Forgings: C10100, C10200, C10300, C10700, C12000, C12200.
Forging & Heat Treatment Equipment List
Forging Production Flow
Enquiry With Drawing In Details
Confirm Steel Material, Chemical Compositions, Mechanical Properties, Tolerances
Confirm Payment Terms, Order Materials or Check Material in Stock
Check Material Chemical Compositions, Material Weight, Dimensions
Cut Materials, Record Weight, Pre-Heating For Forging
Forging Ratios, Heat Treatment After Forging, Dimension Check
Rough Machining, UT Test, Heat Treatment
Fine Machining, UT & PT Test, Dimensions Inspection, Mechanical Properties Test
Customer Inspection at Site, Packing, Delivery Arrangement
Balance Payment Confirmation, Dispatch Forgings or Castings
Bill of Loading Confirmation, MTC Dispatch, Customs Clearances
Order Accomplished!
Basic Information
Trade & Market
Factory Information
Supplier Assessment Report
Request a Supplier Assessment Report
– OEM and ODM service is offered.
-Repair and engineering consult service is offered.
-One-stop service is offered from design, production and assembly to delivery.
-Export door to door delivery is offered usance L/C can be accepted.
-We have a profession sale team can provide 24 hours service with you. If you have needs, please feel free to contact me.
Q: Are you trading company or manufacturer?
A: We are factory and trading company.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>1000USD, 30% T/T in advance ,balance before shipment.
If you have another question, pleasefeel free to contact us as below:
Not exactly what you want?Post a quick Buying Request!